Public prohibited from interfering in relief work
The government has declared water gates and flood barriers special control zones as it struggles not only with the disaster but also with interference from protesting affected residents.
Sales rush
People wade through floodwater to buy
food at SiMumMuang market in Rangsit. Many residents are stockpiling as
food shortages are reported in some areas. PATTANAPONG HIRUNARD
The provincial governors of Pathum Thani and Ayutthaya yesterday
announced water gates, flood barriers and water pump stations had been
declared off-limits to the public.
The announcement, issued under Section 31 of the Disaster Prevention
and Mitigation Act, prohibits any persons from disrupting the
authorities' disaster management works and gives powers to local
administrative officials to remove or destroy any structures that
obstruct disaster control operations.
Prime Minister Yingluck Shinawatra ordered the closure of Phra-in
Racha sluice gate in Khlong Raphipat in Bang Pa-in district of Ayutthaya
province, adjacent to Khlong 1 in Khlong Luang district of Pathum Thani
yesterday.
Atwo-metre-long crocodile captured in flooded Cholada housing estate in Nonthaburi’sBang Bua Thong district. PATIPAT JANTHONG
The order came after week-long opposition from locals. The failure to
close the sluice gate sent floodwater from Wang Noi district of
Ayutthaya through Khlong 1 to Rangsit in Pathum Thani and further to
Khlong Prem Prachakorn, which flows down to Bangkok.
Run-off from Pathum Thani and overflow from Khlong Prem Prachakorn has already flooded northern Bangkok.
Ms Yingluck ordered police to guard the Phra-in sluice gate and had
Chatchawal Panyawatheenant, deputy director-general of the Irrigation
Department, hold the key of the gate.
Irrigation officials, however, could not close the sluice gate due to strong flood currents.
The announcements by the governors and the Prime Minister followed
confrontations between the locals and authorities over flood relief
measures.
On Saturday night, a group of tambon Khukot villagers in Pathum
Thani's Lam Luk Ka district tried to disrupt the construction of a dyke
by officials working to prevent floodwater flowing into Khlong Prem
Prachakorn.
The villagers feared the dyke would prevent water from being drained
out of their district. Gunshots were heard at the scene but there were
no injuries. The officials were forced to retreat.
The prime minister yesterday expressed her concern about Don Muang
and Laksi districts in northern Bangkok, which could suffer flooding
from the northern runoff, and increasing water levels in Khlong Prem
Prachakorn and Khlong Prapa.
She said floodwater would be drained through Bangkok's canals into
the sea and told city residents it was inevitable they would be affected
to some extent.
Overflows continued to flood areas near waterways in northern and some central parts of Bangkok yesterday.
Floods were expanding in Don Muang and Laksi districts because
officials failed to block the water at Phra-in Racha sluice gate and
repair a broken dyke along Khlong 2 in Pathum Thani.
Residents destroyed another part of the dyke under Khlong 2 bridge on
Phahon Yothin Road, allowing floodwater to flow through Lam Luk Ka and
into Khlong Prem Prachakorn.
Floods covered sections of Phahon Yothin Road in front of the
National Memorial, the entrance of Don Mueang airport and the Royal Thai
Air Force headquarters, as well as Song Prapha Road and Chaeng Watthana
Road between Khlong Prapa and the government complex.
Communities along Khlong 2 in Sai Mai were 10-40cm under water.
Phahon Yothin Soi 54/1, which runs parallel to Khlong 2, was also slightly flooded.
However, the dyke along Khlong Hok Wa from Rittiyawannalai 2 School
to the southern sluice gate of Khlong 2 remained higher than the level
of the canal, despite its levels rising by about 30cm yesterday.
Officials and volunteers continued working to elevate the dyke and guard it around the clock.
In inner Bangkok, a dyke was elevated to 3.5 metres in Khiew Khai Ka
community by the Chao Phraya River on Sam Sen Road in Dusit district to
protect the road from overflow.
Some locals left their houses when power was cut as a safety measure.
Nearby Rajinibon School was 70-80cm under water as the flood pushed through the foundations of its concrete fence.
Officials sped up the draining of water out of Khlong Prapa to reduce
the volume of water flowing into the canal, easing flooding along Liap
Khlong Prapa and Prachachuen roads yesterday.
Pramote Maiklad, former director-general of the Royal Irrigation
Department who was advising the flood drainage, told a press conference
at the government's Flood Relief Operations Command at Don Mueang
airport yesterday that all parties in the government sector agreed that
floodwater from Bangkok's northern outskirts had to be drained through
canals in the eastern districts of the capital and Samut Prakan province
into the sea.
Mr Pramote said he had also discussed this with the Bangkok
Metropolitan Administration and confirmed that City Hall's flood
management plan was in accordance with the government's.
Source: Bangkok Post

Comments
Post a Comment